In Virginia, Appalachian Power has a pending increase of about +$9.10/month for a typical 1,000 kWh home starting March 2027, if regulators approve the request.

Details and sources · Estimate for your home

Rate changes, newest first

2026 biennial base rate review (Virginia)

Base rate case · Virginia · Electric

Proposed

Typical residential bill (1,000 kWh/month)

  • +$9.10/mostarting March 2027APCo's estimate, net of savings from its 2026 securitization. APCo says it would be $8.38 higher without securitization.

Proposed amounts; regulators may change them.

Filed
May 29, 2026
Decision expected
January 2027
Requested effective
March 2027
Requested increase
$61.4 million
Approved increase
Pending
Docket
PUR-2026-00044

APCo asked the SCC for a net $61.4 million annual base rate increase at a 10.5% ROE (now 9.75%). It says a home using 1,000 kWh would pay about $9.10 more a month, after securitization savings. The SCC must rule by Jan. 15, 2027, and new rates could start in March 2027. A separate renewable-energy (RPS) filing would add about $3.99 a month.

Utility's stated reasons

  • inflation, labor and material costs
  • distribution and generation investment
  • major storm recovery and vegetation management
  • state-mandated programs
Sources (3) · Verified against regulator or utility filings

Last verified Sep 29, 2026

2026 inflation-based base rate adjustment (West Virginia)

Other · West Virginia · Electric

In effect

Typical residential bill (1,000 kWh/month)

  • +$4.84/mostarting June 1, 2026APCo's figure. The 4% applies to the base-rate part of residential bills only, not the whole bill.
Filed
Not disclosed
Decided
April 16, 2026
Effective
June 1, 2026
Requested increase
Not disclosed
Approved increase
$40.1 million
Docket
Case No. 24-0289-E-P (reopened) et al.

Instead of a new rate case, the PSC offered and APCo and Wheeling Power accepted a 4% inflation increase to residential and commercial base rates (2.5% industrial), about $40.1 million a year, from June 1, 2026. In return they agreed not to file a base rate case before June 1, 2027. APCo puts the impact at $4.84 a month at 1,000 kWh. Customer groups have appealed to the WV Supreme Court.

Utility's stated reasons

  • inflation in labor, materials and fuel costs
  • continued grid investment
Sources (4) · Verified against regulator or utility filings

Last verified Sep 29, 2026

Plant and storm cost securitization (Virginia)

Rider · Virginia · Electric

In effect

Typical residential bill

Not stated for a specific usage level. Any figures the sources give are in the summary below.

Filed
July 10, 2025
Decided
November 24, 2025
Effective
May 2026
Requested increase
Not disclosed
Approved increase
Not disclosed
Docket
PUR-2025-00116

Under a 2025 state law, the SCC approved APCo's plan to refinance about $1.2 billion of Amos and Mountaineer plant costs and $141 million of 2024-2025 storm costs with bonds (financing order Nov. 24, 2025). APCo issued about $1.4 billion of 20-year bonds in May 2026, adding a bond-cost charge and a base rate reduction credit. APCo estimated savings of $11.44 a month at 1,000 kWh vs usual recovery.

Utility's stated reasons

  • refinance coal plant balances and storm costs at lower cost
Sources (3) · Verified against regulator or utility filings

Last verified Sep 29, 2026

Plant, fuel and storm cost securitization (West Virginia, Case No. 25-0310-E-PC)

Rider · West Virginia · Electric

Approved

Typical residential bill

Not stated for a specific usage level. Any figures the sources give are in the summary below.

Filed
2025
Decided
March 31, 2026
Effective
Not disclosed
Requested increase
Not disclosed
Approved increase
Not disclosed
Docket
Case No. 25-0310-E-PC

The PSC's March 31, 2026 financing order lets APCo and Wheeling Power issue about $2.6 billion of bonds, updated in July 2026 to $2.7 billion ($1.7 billion for APCo). The bonds cover unrecovered fuel costs, Amos, Mitchell and Mountaineer plant balances, environmental costs and storm costs. The PSC says bond financing avoids an equity return and income taxes. Issuance is expected in Q4 2026.

Utility's stated reasons

  • refinance unrecovered fuel costs, plant balances and storm costs
Sources (2) · Verified against regulator or utility filings

Last verified Sep 29, 2026

2025-2026 fuel factor decrease (Virginia)

Fuel / purchased power · Virginia · Electric

In effect

Typical residential bill (1,000 kWh/month)

  • −$10.06/mostarting November 1, 2025Interim rate. The per-kWh change is computed from the stated fuel factors, 4.139 to 3.133 cents/kWh.
Filed
Not disclosed
Decision expected
—
Effective
November 1, 2025
Requested increase
Not disclosed
Approved increase
Not disclosed
Docket
Not disclosed

APCo asked the SCC to cut its Virginia fuel factor from 4.139 to 3.133 cents per kWh, citing lower energy prices and more renewable purchases. The lower rate took effect on an interim basis Nov. 1, 2025, saving about $10.06 a month at 1,000 kWh. Fuel is passed through to customers at cost with no profit to the utility.

Utility's stated reasons

  • lower energy prices
  • more renewable power in the supply mix
Sources (2) · Based on news or utility announcements

Last verified Sep 29, 2026

2024-2025 base rate case (West Virginia, Case No. 24-0854-E-42T)

Base rate case · West Virginia · Electric

Partially approved

Typical residential bill

Not stated for a specific usage level. Any figures the sources give are in the summary below.

Filed
November 1, 2024
Decided
August 28, 2025
Effective
August 28, 2025
Requested increase
$250.5 million
Approved increase
$91 million
Docket
Case No. 24-0854-E-42T

APCo and Wheeling Power sought $250.5 million (14.6%). In August 2025 the PSC approved $76.1 million, raised to $91.0 million in February 2026 when it set a 9.75% ROE on reconsideration. The PSC kept customer bills unchanged; the increase is being deferred and added to the balance to be securitized.

Sources (4) · Verified against regulator or utility filings

Last verified Sep 29, 2026

2024 biennial base rate review (Virginia)

Base rate case · Virginia · Electric

Partially approved

Typical residential bill

Not stated for a specific usage level. Any figures the sources give are in the summary below.

Filed
March 28, 2024
Decided
November 20, 2024
Effective
2025
Requested increase
$95.1 million
Approved increase
$9.77 million
Docket
PUR-2024-00024

APCo asked for a $95.1 million base rate increase (later cut to about $64 million after filing errors), citing tree-trimming, deferred fuel carrying costs and higher O&M. The SCC approved $9.77 million a year, effective in 2025; news reports put the residential impact at under $2 a month. The SCC also ordered steps to reduce disconnections.

Utility's stated reasons

  • higher vegetation management costs
  • carrying costs on deferred fuel balances
  • higher operations and maintenance costs
Sources (2) · Based on news or utility announcements

Last verified Sep 29, 2026

What it could mean for your bill

Sources state the impact for one typical home. Enter your own usage or bill for a rough estimate.

I know my
kWh/month

Enter a number to see a rough estimate for your home.

Who decides

  • Virginia State Corporation Commission (Virginia)
  • Public Service Commission of West Virginia (West Virginia) · Search dockets

Utility website: www.appalachianpower.com

Other utilities nearby

Last checked Oct 2, 2026. Spotted something out of date? Tell us.